New Build on a challenging site, split level, ready to hand over to the clients with Mitsubishi Ecodan Air source heat pump and 3rd part cylinder,MVHR, Air Pressure Testing
AP Achieved - 5.55m3/hr/ m2, lager cavity walls with high grade insulation, wet plastered external walls, under floor heating with Rads upstairs and 5KW PV solar with 5KW battery back up